Home>Railroad>St-PanAm>by Engine>MEC>MEC 7000s>MEC 7585
Home>Engine Maker>General Electric (GE)>Freight>C40-8>MEC 7585
Click on an image for a larger view.
Click on the ▶ to play the video.
PanAm MEC engines 7585, & 3405 bring POWA through Monmouth on November 7th of 2020.
Video by John Erickson.
PanAm MEC engines 7585, 7518, 506, 7534, & 619 bring POWA through Oakland on December 4th of 2020.
Video by John Erickson.
Number | Marks | Current Disposition | Eng. Serial No. | Eng. Built: | Date Acquired: |
---|---|---|---|---|---|
7585 | MEC | Active | 46076 | 9/1989 | 1/2017 |
Eng. Type: | Engine Maker: | Trucks: | Horsepower: | Weight: | Engine: |
C40-8W | GE | Hi-Adhesion C-C | 4000 | 391,600 lbs | 4-cycle Model 16FDL |
Bore & Stroke: | Fuel Capacity: | Truck Wheel Base: | Tractive Effort (starting): | Gear Ratio: | Speed: |
9" X 10.5" | 4600 gal. | 13'-07" | 92,750 lbs @ 25% | 83:20 | 70 mph |
All diesel engine data is usually from The Diesel Shop with inclusions from Wikipedia where the information on The Diesel Shop was spotty. Former Maine Central Locomotives are checked against Maine Central Diesel Locomotives Revised Edition by Edwin B. Robertson.
Heritage: GECX 9021 ex < CSXT 7585